In 2008, it was awarded with “National Export Commodity Inspection-totally free Company”.
Overview
Fast Details
- Relevant Industries:
-
Production Plant
- Model Identify:
-
OEM
- OEM Services:
-
Assistance
- Tolerance:
-
.01-.05mm or Tailored
- Certification:
-
ISO9001, SGS
- Surface area Therapy:
-
Sandblasting,Sharpening,Anodize, Zinc,Nickel,Chrome,Plating, and so forth.
- Software:
-
Vehicle,Healthcare Equipments,Electrical Equipment,Hardware,and so forth.
- Dimension:
-
As Customers’ Ask for
- Equipment:
-
Milling/Lathe/Drilling/Four/Three Axis CNC Machining Centre
- Drawing Format:
-
Professional/E, Automobile CAD, Reliable Performs,IGS,UG, CAD/CAM/CAE
Source Capacity
- Provide Capability:
- 10000 Piece/Parts per Thirty day period
Packaging & Shipping and delivery
- Port
- nb
-
Guide Time
: -
Quantity(Parts) 1 – 500 >500 Est. Time(times) thirty To be negotiated
On-line Customization
Personalized Precision cnc machining price cnc milling machining parts
Product Description
Product Kind | CNC turning, milling, drilling, grinding, wire EDM reducing and so forth. |
Our Providers | CNC Machining,Plastic Injection,Stamping,Die Casting,Silicone And Rubber,Aluminum Extrusion,Mould Creating,etc |
Material | Aluminum,Brass,Stainless Steel,Copper,Plastic,Wooden,Silicone,Rubber,Or as per the customers’ requirements |
Surface Treatment method |
Anodizing,Sandblasting,Painting,Powder coating,Plating,Silk Printing,Brushing,Polishing,Laser Engraving |
Dimension | As customers’ request |
Service Undertaking | To give creation layout, production and technological provider, mould development and processing, and many others |
Drawing Format: | PRO/E, Auto CAD, Solid Functions,IGS,UG, CAD/CAM/CAE |
Testing Equipment | Digital Peak Gauge, caliper, Coordinate measuring device, projection equipment, roughness tester, hardness tester and so on |
Industry utilised | Machinery large duty gear electronic gadget Auto spare elements optical telecommunication |
Packing | Eco-pleasant pp bag / EPE Foam /Carton boxes or wooden boxes As customer’s specific needs |
Trial sample time | 7-10 days right after confirmation |
Delivery time | 7-thirty times after receive the pre-payments |
Payment Phrases | T/T,Western Union,Paypal |
Far more services
A lot more Production Portion
Area Remedy
Manufacturing Process
Why Us